Vertex Logo Vertex Home Page Vertex Home Page

Highway / Street / Bridge

I-25 and Woodman
Location:
Colorado Springs, CO
Owner:
State of Colorado, Contract IM 0252-310
Service:
Construction Manager
Contract Amount:
$30 Million

The project is located in Colorado Springs, Colorado and work consisted of six bridge replacement and interchange modifications, both on I-25 and Woodman Road.  Major work items included; Asphalt Removal; Asphalt Pavement; Concrete Pavement; Erosion Control; Caisson Foundations; Concrete Median Installation; Abutment Wall Construction; Structural Backfill for Highway Bridge Approaches; Concrete Pavement; Bridge Drain; Structural Concrete for Bridge; Silica Concrete Topping; Saw Cutting Bridge Deck; Reinforcing Steel for Bridge Deck; Guardrail; Bridge Rail; Fencing; Structural Steel; Precast Panels; Signage; Structural Steel; Striping; and Anti Graffiti Coating.

View PDF Version Click to download resume

Back to Highway / Street / Bridge Projects

I-70 Bridge Expansion
Tomlinson Bridge
Geaorge Brown Street Bridge
I-25 & Woodman Road Interchange
Bridge Over Route 128 in Gloucester, MA
Coos Bay Bridge