Vertex Logo Vertex Home Page Vertex Home Page

Water / Wastewater

Norwood-Oeffler Water Treatment Plant Expansion
Location:
Miami, FL
Owner:
City of Miami, Florida
Service:
Construction Manager
Contract Amount:
$36.8 Million

This new 15MGD facility includes; nine aquifer offsite wells; sand separators; remote electrical buildings; operations building; a process building that includes three low pressure reverse osmosis (RO) membrane skids and three nanofiltration (NF) membrane treatment skids; pre and post chemical feed systems, micron filtration, high pressure pumping, and motor control center; bulk chemical storage facilities with containment; degasification and odor control scrubber system; chlorine contact chamber; 5MG prestressed concrete potable water ground storage reservoir; high service pump building; sodium hypochlorite chemical feed building; submersible wastewater pump stations; deep injection well booster pump station; and lime sludge management system.

Back to Water / Wastewater Projects

 Ina Road Water Pollution Control  Norwood Water Treatment Wards Island  Reclamation Facility  Coachella  Billerica Water Treatment
Brady’s Lake Dam  Northern Water Reclamation Facility Braintree Sewer and Water Line Install