Ina Road Water Pollution Control
 

Construction

Ina Road Water Pollution Control

Pima County, AZ
Pima County
Construction Manager / Completion Contractor
$40M
Vertex first began providing CM services to the surety in March of 2004 for a faltering subcontractor. During this period, the General Contractor also defaulted and in January of 2005, Vertex was asked to step in as the new bonded Completion Contractor. Vertex was responsible for all remaining contract responsibilities including the completion and remediation of defective epoxy painting, remediation of the grout floor in the primary clarifiers, remediation of the plant underground RCP, installation of the remaining mechanical, electrical, and communication infrastructures, completion of the asphalt roads and retention basins, plant testing, training and startup.

 
Ward’s Island
 

Construction

Ward’s Island

New York, NY
New York Department of Environmental Protection
Surety Completion / Construction Manager
$36.8M
The project consisted of an Electrical System Modernization at three Water Pollution Control Plants. Vertex coordinated all of the remaining contract work, completed all outstanding close out issues, and worked with the New York Department of Environmental Protection to develop a final punch list.

 
Coachella Valley Water Reclamation
 

Construction

Coachella Valley Water Reclamation

Thermal, CA
Coachella Valley Water District
Cost to Complete
$3.6M
Performed cost to complete analysis and issued a request for proposal to assist a major surety in the replacement of the bonded General Contractor for the $3 million Chlorinated Facility Upgrade of the Mid Valley Water Reclamation Plant for the Coachella Valley Water District Plant #4. We also investigated the Owner's termination of the General Contractor for default on their contract. Vertex also assisted the surety in the solicitation, evaluation and selection of the replacement contractor.

 
Norwood-Oeffler Water Treatment Plant Expansion
 

Construction

Norwood-Oeffler Water Treatment Plant Expansion

Miami, FL
City of Miami
Construction Manager
$36.8M
This new 15 MGD facility includes nine aquifer offsite wells; sand separators; remote electrical buildings; operations building; a process building that includes three low pressure Reverse Osmosis (RO) membrane skids and three nanofiltration (NF) membrane treatment skids; pre and post chemical feed systems, micron filtration, high pressure pumping, and motor control center; bulk chemical storage facilities with containment; degasification and odor control scrubber system; chlorine contact chamber; 5 MG prestressed concrete potable water ground storage reservoir; high service pump building; sodium hypochlorite chemical feed building; submersible wastewater pump stations; deep injection well booster pump station; and lime sludge management system.

 
Billerica Water Treatment Plant
 

Construction

Billerica Water Treatment Plant

Billerica, MA
Town of Billerica
Project Relet / Project Monitoring
$4M
Provided project relet and project monitoring services of a new water treatment plant.

  • Ina Road Water Pollution Control
  • Ward’s Island
  • Coachella Valley Water Reclamation
  • Norwood-Oeffler Water Treatment Plant Expansion
  • Billerica Water Treatment Plant