Apartment Building Development
 

Env. / Air Quality

Apartment Building Development

Massachusetts
Water Damage & Mold Assessment

Vertex assessed the extent of water damage and mold impacts throughout an unoccupied, framed 3-story apartment building. It was determined that water intrusion was caused by a rain event that occurred during construction when the roof and walls were not yet complete. Following assessment, Vertex developed a Mold Remediation Specification for submittal to the remediation contractors. Additionally, Vertex solicited competitive abatement proposals. We documented baseline moisture conditions, and monitored the remedial progress to ensure compliance with work specifications and industry standard abatement guidelines. Upon completion of remediation, Vertex performed the post-remedial visual clearance inspections.

 
Apartment Complex Development
 

Environmental

Apartment Complex Development

Marlborough, MA
Water Damage Assessment

Vertex assisted our client in identifying sources of water intrusion and assessed the extent of water damage and visible mold impacts to two partially occupied apartment buildings. It was determined that water intrusion was caused by a leak from a roof cricket. Water intrusion from this leak had reportedly migrated through the attic space and into the common wall cavities of several apartments. Upon completion of the assessment, Vertex offered recommendations to adequately address these impacts.
Additionally, Vertex performed a post-drying and post-cleanup inspection to document the level of work performed by our clients' personnel and provide a determination regarding the level of success of the remedial efforts.

 
Cape Cod Hospital & Campus Building
 

Air Quality

Cape Cod Hospital & Campus Building

Hyannis, MA
Indoor Air Quality (IAQ) Services / Asbestos Abatement

Vertex has a long standing relationship with Cape Cod Hospital and has performed a myriad of IAQ consulting services on an on-going, as-needed basis. These services have included the completion of a facility-wide comprehensive asbestos survey; preparation of asbestos abatement work plans in conjunction with ongoing scheduled renovation activities; full-time asbestos project monitoring during abatement activities and final clearance inspections/testing; water intrusion cause and origin investigations; microbial growth assessments and preparation of mold remediation protocols; mold remediation oversight and post remediation verification criteria; and numerous IAQ assessments in response to complaints of reposed chronic illnesses, discomfort and odors. On all aspects of activities performed at the hospital, Vertex works in concert with the Environmental Health and Safety Officer to comply with Hospital Infection Control protocols.

  • Apartment Building Development
  • Apartment Complex Development
  • Cape Cod Hospital & Campus Building